The last fiberglass part is now almost ready. Hatch lid on stern extension. Lot of measurement and details was needed with the hinge and the flenge of the hatch.
27/06/2014
22/06/2014
21/06/2014
Measuring the whiskey stays
The bowsprit is 70 cm from the bow and nearly one meter from the fore stay. RST stay is fitted underneath to give strenhgt when genacker is pulling. The stay underneath is also stiffener when jumping on it. Here modelling the starboard side GRP whiskey stay.
Making fiberglass whiskey stays
Whiskey stays of GRP laminate
The stays are of GRP with foam core. They are going to be covered with strong coal fiber layers.
The spade
19/06/2014
18/06/2014
Fuel tanks
Extra fuel tank installation.
We are going to have two main tanks 55 l each and 3 x 20 l aluminium cans fitted and secured below deck. We possibly need some extra cans on deck for the Atlantic crossing.
17/06/2014
Mounting the new stern
The stern at its place
Now just to fasten the whole thing. 50 pieces of 8 mm stainless bolts and laminate joint on either side of the hull. Piece of cake but still a lot of details to be solved.
16/06/2014
Making the stern of the boat
The stern is the next project
The stern is made of fiberglass with core material. It is light and srong. Nice surface must be made before installing it to the boat.
15/06/2014
30 days to go!
Keel area is stiff now. Flooring teaks are on their place again. Interior details for windows etc. Are being fitted.
14/06/2014
The deck is now free of canvas. We begin the installations
Now is the time for the deck and the fittings
Kansihelat valmistuvat pakkas-säästä huolimatta. Vettä satelee länsisaaristossa, vielä on hyistä. Pidämme vielä takateltan suojaamassa hirmumyrskyltä.
09/06/2014
Starting to put the interior together again
A lot of screws and work to put the interior together again. We found a new colour beside the varnish. The grey colour is stylish and gives a needed variation for the wood works.
08/06/2014
06/06/2014
RST fittigs are made in Lindströms Platslageri
New targa for the antennas.
Modelling the fitting between the deck and the targa.
New colours and varnish to te interior.
03/06/2014
45 days to go
45 days to go with the building of S/y Naneux for the Atlantic Ocean
Unscrewing everythinh once more to make paint works and last fiberglass reinforcements.
Last fiberglass works before putting the interior together.
Laminating some longitudial stringers between the first and last keel stocks. Making the bottom laminate thicker and stronger on the areas where possible impact is obvious.